results
layers
wall layer
0door layer
0window layer
0furniture layer
0hatch layer
0dimension layer
0text layer
0column layer
0stair layer
0glazing layer
0styles
dimension style
0text style
0hatch library
0units
drawing unit
0room sizes
toilet
0store
0kitchen
0dress
0dining
0puja
0bed room
0utility
0balcony
0living
0deck
0guest
0foyer
0gym
0servant
0wash
0drawing room
0study
0parking
0passage
0home theatre
0lobby
0stairs
riser
0tread
0general notes
this drawing is the property of [firm], and should not be reproduced in part or whole without prior permission from the architect.
01. all dimensions are to be read not to be measured. 2. all dimensions are in meter & mm. 3. all drawings and dimensions must be checked & correlated with structural drawings.
01. all dimensions are to be read not to be measured. 2. all dimensions are in feet inch. 3. all drawings and dimensions must be checked & correlated with structural drawings.
0generals notes: 1. all dimensions are to be read not to be measured. 2. all dimensions are in mm. 3. all drawings and dimensions must be checked & corrected with structural drawings . 4. all mep cut-out size & location dimension check in mep drawing.
01. all dimensions are in mm.do not scale drawing, follow written dimensions only, if in doubt please ask.
0note : beam size & columns as per structure and false ceiling as per interior
0columns & beam shown in this drg. only for reference. pl. refer consultant drg. only for final columns & beams for sunk & plumbing lines pl. refer mep consultant drgs.
0note - false ceiling height should be according to exhaust fan condition on site .
0notes:- all switchboard dimensions are 150mm apart from door until mentioned in drawing.
0proposed location of u.g.tank (location to be approved by arch.)
01. please do not change anything without prior permission of the consultant. 2. contact consultant/architect in case of any change found at site.
03. the grid line is considered parallel to megnetic north as taken at site.
0if any new furniture is made in any autocad file, make sure that the new file is brought to the source file and then given the appropriate layer which is further turned into the block and then used in the plans.
0the above assumes that the super built-up area (sba) including covered verandahs should be around 1.67 times the carpet area. also the built-up area should not be higher than 1.12 times the carpet area.
0